The B&B Decks Building Process | How a Deck Should Be Built
Our Deck Building Process
Our deck building process starts with how you want to use the space and how water moves across your yard. Follow the phases below to see when the crew sets the footings, frames the deck, lays the boards and installs the finish details. If you are comparing estimates, ask each builder where inspections and material decisions fit into that sequence.
Six phases of the deck building process
Ask your builder when you need to choose boards, railing and lighting. For example, choosing stair lights before framing gives the crew time to plan the wiring route. Use the phases below to keep a record of those decisions. See finished B&B deck projects.
Phase 1: Site Evaluation & Planning
Every successful deck begins with proper planning. Before any digging starts, we evaluate soil conditions, drainage, elevation changes, and local code requirements.
- Soil and grade assessment
- Footing layout verification
- Code-compliant pier spacing
- Drainage and water management planning
Phase 2: Foundation Crew – Footings & Concrete Piers
A deck is only as strong as what it sits on. Our dedicated foundation crew installs properly sized, code-approved footings and raised concrete piers to ensure long-term stability.
- Deep, inspected deck footers
- Poured raised concrete foundation piers
- Correct elevation above grade
- Moisture-resistant structural support
This step dramatically reduces settling, sagging, and premature deck failure.
Phase 3: Ground Prep, Drainage & Grading
Improper drainage is one of the leading causes of deck rot and foundation failure. That’s why we prepare the ground before framing ever begins.
- Landscape fabric installation
- 57 stone for drainage and weed control
- Proper grading away from the home
- Clean, professional under-deck appearance
Phase 4: Structural Framing Installation
Once the foundation is complete, our build crew installs the deck framing using industry-best fastening methods and code-approved hardware.
- Pressure-treated or engineered framing
- Proper joist spacing and blocking
- Code-compliant connectors and fasteners
- Designed for strength, airflow, and longevity
Phase 5: Decking, Stairs, Railings & Skirting
With the structure complete, we move into the finish phase—where your deck becomes a true outdoor living space.
- Composite or PVC decking installation
- Custom stairs and landings
- Code-compliant and decorative railings
- Privacy skirting and access panels
Phase 6: Enhancements & Final Details
We finish strong by installing optional features that elevate your outdoor space.
- Deck and stair lighting
- Under-deck drainage or stone systems
- Built-in seating or planters
- Final walkthrough and quality inspection
Why Our Process Matters
Many deck failures occur because builders rush to framing without addressing the foundation and drainage. Our phased approach ensures your deck is structurally sound, visually clean, and built to perform in Hampton Roads’ coastal climate.
Thinking About Building or Rebuilding a Deck?
Whether you’re planning a new deck or concerned about an existing one, our process-focused approach ensures your investment is built correctly from the ground up.
Schedule a Complimentary ConsultationDeck Construction — Done the Right Way
- Site Evaluation & Planning
- Footings & Raised Concrete Piers
- Ground Prep, Stone & Grading
- Structural Framing
- Decking, Stairs & Railings
- Lighting, Enhancements & Final Inspection